September 12, 2022 Planning Board
»
Item I - CHAIRMAN’S OPENING STATEMENT, ROLL CALL
Item I

»
Item IV - RESOLUTIONS FOR MEMORIALIZATION:
1. Docket #632SD – 37 Island Rd, Mahwah, LLC
20 and 22 Mountain Avenue, Block 47, Lots 20 & 21
Major Subdivision with Sewer, Preliminary and Final Site Plan and Soil
Movement Permit Applications, Soil Movement Exceeds 1,000 cubic yards.
Resolution of Approval.
2. Docket #633 – KKTT Restaurant Corp.
150 Franklin Turnpike, Block 71, Lots 6 & 72
Amended Site Plan Application with variance for the proposed atrium expansion.
Resolution of Approval.
Item IV

1. Docket #632SD – 37 Island Rd, Mahwah, LLC
20 and 22 Mountain Avenue, Block 47, Lots 20 & 21
Major Subdivision with Sewer, Preliminary and Final Site Plan and Soil
Movement Permit Applications, Soil Movement Exceeds 1,000 cubic yards.
Resolution of Approval.
2. Docket #633 – KKTT Restaurant Corp.
150 Franklin Turnpike, Block 71, Lots 6 & 72
Amended Site Plan Application with variance for the proposed atrium expansion.
Resolution of Approval.
»
Item VI 1 - Docket #343A-2 – Bank of America
210 Route 17 South, Block 132, Lots 12
Amended Site Plan Application – Exterior renovations and dumpster enclosure.
Item VI 1

210 Route 17 South, Block 132, Lots 12
Amended Site Plan Application – Exterior renovations and dumpster enclosure.
»
Item VI 3 - Review of the 2022 Land Use Element Amendment prepared by Colliers
Engineering and Design, as an Amendment to the Mahwah Township Master
Plan.
For review and consideration of adoption.
Item VI 3

Engineering and Design, as an Amendment to the Mahwah Township Master
Plan.
For review and consideration of adoption.
»
Items VII & VIII - VII. WORK SESSION:
A) NEW BUSINESS:
*1. Review of Redevelopment Plan for Block 82, Lots 1 and 3 through 30
prepared by Colliers Engineering and Design, dated September 8,
2022.
Master Plan Consistency Review
B) OLD BUSINESS:
C) COMMITTEE REPORTS:
VIII. ADJOURNMENT
Items VII & VIII

A) NEW BUSINESS:
*1. Review of Redevelopment Plan for Block 82, Lots 1 and 3 through 30
prepared by Colliers Engineering and Design, dated September 8,
2022.
Master Plan Consistency Review
B) OLD BUSINESS:
C) COMMITTEE REPORTS:
VIII. ADJOURNMENT
© 2023 Swagit Productions, LLC